How to Plan a Concrete Patio: Materials, Depths and Steps
A concrete patio is one of the most rewarding DIY jobs — and one of the least forgiving if you run short of concrete halfway through. This guide walks through planning a patio from bare ground to cured slab, with a full materials list for a 10 × 10 ft (3 × 3 m) example in US and UK units.
1. Decide the size and the fall
Mark out the patio with pegs and string, and live with it for a day or two — it is much easier to move string than concrete. Then plan the fall: a patio must slope slightly so rain runs off, always away from the house.
- US: ⅛–¼ inch of fall per foot is common — 1¼ to 2½ inches across a 10 ft patio.
- UK: a fall of 1:60 to 1:80 is usual — about 40–50 mm across a 3 m patio.
Next to a house, keep the finished surface below the door threshold and weep holes. In the UK, the patio should finish at least 150 mm below the house’s damp-proof course (DPC).
2. Work out the digging depth
A patio has two layers below the surface, so you dig out the depth of both:
| Layer | US | UK |
|---|---|---|
| Concrete slab | 4 in | 100 mm |
| Compacted sub-base | 4 in of crushed stone or crusher run | 100 mm of MOT Type 1 |
| Total dig depth | 8 in below finished level | 200 mm below finished level |
Plan where the soil will go. A 10 × 10 ft patio dug 8 inches deep removes about 2.5 cubic yards of soil, and a 3 × 3 m patio dug 200 mm deep removes 1.8 m³ — and soil bulks up by roughly a quarter once it is dug, so allow for more in a skip or dumpster than the hole suggests.
3. Lay and compact the sub-base
The sub-base spreads the load and stops the slab cracking as the ground moves. Spread it in layers, and compact each layer with a plate compactor (hire one for a day). Compacted stone settles, so order 10–20% more than the flat volume. On soft or clay ground, a geotextile membrane underneath helps stop the stone sinking into the soil.
For a 4-inch (100 mm) base under a 10 × 10 ft (3 × 3 m) patio, the gravel calculator gives about 2.5 US tons of crusher run, or 2.2 tonnes of MOT Type 1 — three 850 kg bulk bags — including 15% extra for compaction.
4. Build the formwork
Formwork holds the wet concrete and sets its finished level, including the fall. Use straight timber boards on edge, held by stakes or pegs every 3 ft (1 m) on the outside, with their tops set to the finished level.
- US: a 2 × 4 is only 3½ in deep, so for a true 4-inch slab use 2 × 6s, or set the 2 × 4s on a slightly lower base.
- UK: 22–25 mm thick boards, 100–150 mm deep, are typical.
Check the fall with a spirit level and a straight edge before you pour — once the concrete is in, the formwork decides the shape.
5. Order the right amount of concrete
A 10 × 10 ft slab 4 inches thick is 33.3 ft³, or 1.23 cubic yards. A 3 × 3 m slab 100 mm thick is 0.9 m³. Add 10% for uneven ground and spillage, then decide between bags and ready-mix:
| US (10 × 10 ft, 4 in) | UK (3 × 3 m, 100 mm) | |
|---|---|---|
| Volume + 10% | 1.36 yd³ | 0.99 m³ |
| Bagged mix | 62 × 80 lb bags | 106 × 20 kg or 85 × 25 kg bags |
| Ready-mix / volumetric | Order about 1.5 yd³ | Order about 1 m³ |
Mixing 60-plus heavy bags by hand is a long, hard day, and the first batches start to set before the last are poured. Above about a cubic yard (0.75 m³), ready-mixed concrete — or a volumetric mixer truck in the UK — is usually cheaper and gives a better slab. Ask about minimum orders and short-load fees, and make sure the truck can get close or that you have barrows and helpers ready. The concrete calculator works out volume and bags for any size, and if you do mix your own, our guide on how to mix concrete explains the method.
Patios do not always need reinforcement, but light steel mesh (A142 is common in the UK) or a fibre-reinforced mix helps control cracking. Ask your supplier what they recommend for your ground.
6. Pour, level and finish
- Wet the sub-base lightly so it does not suck water out of the concrete.
- Pour into the far corner first and spread with a shovel or rake, filling slightly above the formwork.
- Pull a straight board (a screed) across the top of the formwork in a sawing motion to level it.
- Once the surface water has gone, smooth it with a float, round the edges with an edging tool, and finish with a stiff brush for grip if you like.
7. Cut control joints
Concrete shrinks as it cures, and it will crack somewhere — control joints decide where. A common rule is joints every 2–3 times the slab thickness in inches, measured in feet: for a 4-inch slab, every 8–12 ft. Make them about a quarter of the slab’s depth (1 inch or 25 mm) with a grooving tool while the concrete is fresh, or with a saw the next day. For a 10 × 10 ft (3 × 3 m) patio, one joint across the middle each way gives four even panels.
8. Cure it properly
- Keep the concrete damp — cover it with plastic sheeting or mist it with water — for about 7 days.
- Light foot traffic is usually fine after 24–48 hours; concrete reaches its design strength at around 28 days.
- Do not pour if frost is forecast within a couple of days, or below about 5 °C (40 °F). In hot sun, shade and dampen it so it does not dry too fast.
- Keep de-icing salt off new concrete for its first winter — see the ice melt guide.
Materials checklist (10 × 10 ft / 3 × 3 m patio)
| Item | US | UK |
|---|---|---|
| Sub-base | ≈ 2.5 tons crusher run | ≈ 2.2 tonnes MOT Type 1 |
| Concrete | ≈ 1.5 yd³ ready-mix, or 62 × 80 lb bags | ≈ 1 m³ ready-mix, or 106 × 20 kg bags |
| Formwork | 4 × 12 ft 2 × 6 boards (cut to fit) + stakes | 4 × 3.6 m boards, 100–150 mm deep (cut to fit) + pegs |
| Optional | Wire mesh or fibre mix, geotextile | A142 mesh or fibre mix, geotextile |
| Hire | Plate compactor (and mixer if using bags) | Plate compactor (and mixer if using bags) |
Larger or thicker slabs — driveways, garage bases, anything supporting a structure — may need a deeper base, reinforcement and approval from your local building department or building control. When in doubt, ask a professional.
Prefer pavers or patio slabs to poured concrete? They use the same compacted sub-base, with a sand or mortar bed instead of a slab — the paver calculator works out the pavers, base and bedding.