How to use the plaster calculator
- Enter the room’s length, width and wall height, and the total area of doors and windows — or switch to “Total area” and enter the area directly.
- Choose the plaster: a finish (skim) coat, or an undercoat for bare masonry or uneven walls.
- Check the thickness. The standard figures are filled in for you; increase it for uneven walls.
- Keep about 10% extra. Plaster that has started to set cannot be re-mixed, so some waste is unavoidable.
Replastering from bare brick or block needs both an undercoat and a finish coat: run the calculator once for each.
How plaster is calculated
Wall area = 2 × (length + width) × height − doors and windows Plaster = area × thickness × weight per m² per mm × (1 + waste) Bags = plaster ÷ bag weight, rounded up
| Plaster | Usual thickness | kg per m² at that thickness | Coverage of a 25 kg bag |
|---|---|---|---|
| Finish / skim coat | 2 mm | 2.5 | 10 m² |
| Undercoat – bonding coat | 11 mm | 9.1 | 2.75 m² |
| Undercoat – hardwall | 11 mm | 8.3 | 3 m² |
These figures come from manufacturers’ stated coverage for gypsum plasters. Coverage varies with the surface and the plasterer, so treat the bag count as a close estimate and check the bag you buy.
Worked example (UK)
A 4 × 3.5 m room with 2.4 m walls has 36 m² of wall. Taking off 3.5 m² for a door and window leaves 32.5 m². A 2 mm skim uses 2.5 kg per m²: 81 kg, or 89 kg with 10% extra — 4 bags of 25 kg. The same walls in an 11 mm bonding coat would need 325 kg: 13 bags.
Worked example (US)
A 14 × 12 ft room with 8 ft walls has 416 ft² of wall, or 376 ft² after taking off 40 ft² of openings. A finish coat about 5⁄64 in (0.08 in) thick uses about 0.52 lb per ft²: 215 lb with 10% extra — 5 bags of 50 lb, each covering roughly 96 ft².
Before you start
- Check the date on the bag. Gypsum plaster has a shelf life of a few months and sets too fast when old. Buy it fresh and store it dry, off the floor.
- Mix with clean, cold water in a clean bucket. Traces of old set plaster make a new mix go off quickly.
- Mix a bag at a time, or less. Finishing plaster stays workable for roughly an hour and a half; a beginner will cover far less than a bag in that time.
- Boarding first? The drywall and plasterboard calculator works out the sheets, and the paint calculator the paint once the plaster is dry.
Frequently asked questions
How much area does a 25 kg bag of plaster cover?
A 25 kg bag of finishing plaster covers about 10 m² at the usual 2 mm skim thickness. Undercoat plasters go on much thicker: a 25 kg bag of bonding coat covers about 2.75 m² at 11 mm, and hardwall about 3 m² at 11 mm. Coverage halves if you double the thickness.
How thick should a skim coat be?
About 2 mm (roughly 5⁄64 in), applied as two thin coats one after the other. Undercoat plaster is normally 11 mm on walls and 8 mm on ceilings, followed by the 2 mm finish. Trying to fill deep hollows with finishing plaster leads to cracking — level them with undercoat or filler first.
What is the difference between bonding coat and hardwall?
Both are undercoat plasters. Bonding coat is for smooth, low-suction surfaces such as concrete, painted walls treated with a bonding agent, and plasterboard. Hardwall is for masonry that absorbs water — brick and medium-density block — and is tougher once set. Neither is a finish: both are skimmed over.
Can I skim over old plaster or painted walls?
Yes, if the old surface is sound. Remove loose or hollow patches, wash off grease, and apply a bonding agent first — PVA adhesive diluted as directed, or a grit-based bonding primer on glossy paint — so the new plaster sticks and does not dry too fast.
How do I skim coat a wall in the US?
Plaster skimming as done in the UK is uncommon in the US, where walls are usually drywall finished with joint compound. A “skim coat” there means a thin layer of joint compound over the whole wall, or veneer plaster over blueboard. This calculator works for gypsum plasters by weight and thickness; for joint compound, use the coverage printed on the bucket.
How long does plaster take to dry before painting?
A skim coat on plasterboard typically dries in 3–7 days; thicker undercoat work can take 2–4 weeks. It is ready when it has turned an even pale pink with no dark patches. Start with a thinned “mist coat” of emulsion (latex) paint so the paint soaks in and bonds.