How to use the asphalt calculator
- Measure the length and width of the area. For curved or irregular driveways, work out the area with the square footage calculator and enter it as a length with a width of 1.
- Enter the compacted thickness of each layer. For a single layer, set the binder course to 0 and enter the full thickness as the surface course.
- Keep about 5% extra for edges, uneven base and the last load, then read off the weight to order.
How asphalt tonnage is calculated
Asphalt is sold by weight, so the calculator works out the compacted volume and multiplies by the density. The standard planning figure for compacted hot-mix asphalt is 145 lb per cubic foot — about 2,323 kg/m³. Real mixes usually fall between about 140 and 150 lb/ft³, so ask your supplier if they quote a different figure.
Volume (ft³) = area (ft²) × thickness (in) ÷ 12 Tons = volume × 145 ÷ 2,000 Tonnes = area (m²) × thickness (m) × 2.323
Worked example (US)
A 40 × 12 ft driveway is 480 ft². A 2 in binder course is 80 ft³ and a 1.5 in surface course is 60 ft³, so 140 ft³ in total. At 145 lb/ft³ that is 20,300 lb, or 10.15 tons — 10.66 tons with 5% extra (6.09 tons of binder and 4.57 tons of surface mix).
Worked example (UK)
A 10 × 4 m driveway is 40 m². A 60 mm binder course is 2.4 m³ and a 25 mm surface course is 1.0 m³. At 2.323 t/m³ that is 7.9 tonnes, or 8.29 tonnes with 5% extra (5.85 tonnes of binder and 2.44 tonnes of surface course).
Typical layer thicknesses
| Layer | US driveway | UK driveway |
|---|---|---|
| Surface course | 1–1½ in | 20–30 mm (e.g. 6 mm or 10 mm dense mix) |
| Binder / base course | 1½–2 in | 50–60 mm (e.g. 20 mm dense binder) |
| Total asphalt | 2–3 in (3–4 in for heavy vehicles) | 70–90 mm |
| Aggregate base / sub-base | 4–8 in compacted gravel | 100–150 mm MOT Type 1 |
Thicker layers and a deeper base are needed on soft ground, for heavier vehicles such as RVs and vans, and in areas with hard frosts. The base matters as much as the asphalt: most driveway failures start with a thin or poorly compacted base. Our gravel driveway guide explains how a sub-base is built up and compacted.
What this calculator does not include
- The gravel base or sub-base — use the gravel calculator.
- Edging, drainage channels and any tack coat sprayed between layers.
- Sealcoat, which is applied to US driveways after the asphalt has cured, usually a few months later.
Hot asphalt has to be laid and rolled while it is hot, with a roller and specialist tools, so most driveways are laid by contractors. This calculator helps you check a quote: compare the tonnage and thickness they price with the figures here.
Frequently asked questions
How many tons of asphalt do I need for a driveway?
Multiply the area in square feet by the compacted thickness in inches, then by 145 lb/ft³ ÷ 12 ÷ 2,000. A 1,000 ft² driveway at 3 inches needs about 18 tons. In metric, multiply the area in m² by the thickness in metres and by about 2.3 tonnes per m³: 40 m² at 85 mm is about 7.9 tonnes.
How much does a ton of asphalt cover?
At 145 lb/ft³, one US ton covers about 80 ft² at 2 in, 55 ft² at 3 in and 40 ft² at 4 in. One tonne of tarmac covers about 8.6 m² at 50 mm or 17 m² at 25 mm.
How thick should an asphalt driveway be?
Most US residential driveways have 2–3 inches of compacted asphalt, often laid as a binder course and a thinner surface course, over 4–8 inches of compacted gravel base. UK domestic tarmac driveways typically have a 50–60 mm binder course and a 20–30 mm surface course over 100–150 mm of MOT Type 1 sub-base.
Is asphalt the same as tarmac?
In everyday use, yes. “Tarmac” in the UK and “blacktop” in the US both usually mean asphalt concrete: stone aggregate bound with bitumen. Strictly, original tarmacadam used tar, which is no longer used for roads and driveways.
Does the thickness mean before or after rolling?
After. Specifications and this calculator use compacted thickness. Loose hot asphalt is laid roughly 25% thicker and rolled down to the finished depth, so the weight you order is based on the compacted figure.
Does this include the gravel base?
No — the sub-base is a separate material ordered by the ton or tonne. Use the gravel calculator with “road base / crusher run / MOT Type 1” selected to work it out.